How long does structural drying take in Jacksonville?
It depends on the materials, the depth of the water and the air. Drying is measured in readings, and most jobs run for several days before every material reaches its dry goal. Humid weather lengthens the time, and an older house with plaster and solid wood takes longer than a newer one.
The drying rate slows as the materials get closer to their dry goal. The first day or two removes most of the water from the surface, and the rest takes longer as the moisture moves out of the deeper layers. The readings show when that slow tail is complete.
A crew cannot promise a finishing day before it has seen the building and taken the first readings. The plan is revised at each visit, and you receive the readings at the same time, so the progress is clear.
Why does humidity slow drying so much here?
Because the air outside holds moisture that can move into the house as the house dries. A dehumidifier must remove both the water from the materials and the water coming in from the air. The crew reads the indoor and outdoor air and sets the equipment to suit it.
On a humid day, opening a window to let air through can add moisture to the room faster than the dehumidifier can take it out. The crew may ask you to keep windows and doors closed while the drying runs, so that the equipment is working on the water in the building.
The same air problem affects closets, cabinets and the space under stairs. Those spaces hold moisture even after the room is dry, and they are checked separately before the job is closed.
What is a dry goal, and who sets it?
A dry goal is the reading a material must reach before it is considered dry. The crew sets it for each material, using a reference reading from unaffected material in the same building or a standard reading for that type of material. The goal is written in the log.
A reference reading is taken from a part of the building that was not wet, such as a wall on the far side of the house. The wet materials are measured against it, so the target reflects the building and not a general figure.
The goals are shared with you and with the repair trade. A floor or wall that reaches its goal can be closed or repaired, and one that does not reach it is looked at again before any repair is started.
What moves the scope of a drying job?
The number of rooms and materials affected, the depth of the wetness, the construction of the building and the air conditions decide the scope. The price is explained and approved on site before drying starts, and changes are explained first.
The more materials the water reached, the more readings and equipment the job needs. A house with plaster, wood floors and built-in cabinets takes more care than one with drywall and vinyl, and that care adds time.
The equipment and the number of visits are set by the readings as the drying progresses. None of these factors is turned into a figure on this site; the scope and the price are explained in the building and approved by you first.
Can the equipment be removed early to save time?
No. Equipment removed before the readings reach their goal lets the moisture come back into the materials, and the drying has to start again. The equipment stays until the readings confirm the goal, and the decision to remove it is made with you.
A room that feels dry is not the same as a room that is dry. Surface moisture leaves quickly, and the moisture in the framing and subfloor leaves slowly. Removing equipment on the feel of the room is a common cause of a second round of mold and swelling.
The readings for each room are shared at the final visit, so you can see the evidence for the release. If something is still wet when the rest of the house is dry, the crew says so and explains what it will do about it.